NIT’s of various Electrical works at SLIET Longowal for the F/Y 2024-25

Replacement of 11 KV HT VCB installed in ESS-I, HT Room at SLIET Longowal

Supply of Electrical Material for Annual Repair & Maintenance at SLIET, Longowal for the F/Y 2024-25

Laying of additional LT cable to Science Block from ESS-II at SLIET Longowal

Various Street & Area Lighting works at SLIET Longowal